Engineering Excellence Meets Industrial Automation at Kingfield Galvanizing’s New Home

We are proud to have delivered a state-of-the-art facility for Kingfield Galvanizing in Somerton, an industrial warehouse purpose-built to accommodate one of Australia’s most advanced automated galvanizing operations.

This 7,300m² facility, located on a 14,700m² site, is the result of close collaboration, precise engineering, and a deep understanding of complex industrial processes. Purpose-built to support a high-capacity, heavy-lift galvanizing plant, the project includes a 6,800m² warehouse and a 500m² office, all tailored to meet the rigorous demands of automated steel processing.

Somerton, VIC

Location

Kingfield

Client

AKeng Pty Ltd

Architect

$0 million

Project Value

December, 2014

Completion Date

14,700m²

Total Land Area

7,300m²

Total Building Area

6,800m²

Warehouse Area

500m²

Office Area

7,600m²

Car Park Area

Heavy-Lift Innovation: A State-of-the-Art Galvanizing Hub Delivered by Corplex

A standout feature of the facility is its integration of nine overhead travelling cranes and a sophisticated monorail system, designed to move large steel components through the galvanizing process with remarkable accuracy and efficiency. The monorail includes strategically placed turntables for lateral movement, with tolerances calibrated to within 12mm vertically and 15mm horizontally, a testament to the precise standards achieved throughout the build.

Externally, the development includes 7,600m² of carpark and hardstand area, with 89 on-site car spaces. The 6,400m² hardstand was engineered for high-load capacity, facilitating seamless heavy vehicle access, efficient logistics, and external storage. The site layout was carefully designed to optimise staging areas for both raw and treated materials, ensuring a smooth operational flow from delivery to dispatch.

Precision and Power: Corplex Unveils Cutting-Edge Galvanizing Facility in Somerton

Supporting operations is a modern 500m² office space, providing a functional and comfortable environment for management and support staff. This includes open-plan work areas, meeting rooms, and amenities, ensuring strong integration between the administrative and production sides of the business.

Delivering a technically complex facility of this scale in Somerton required disciplined project management, close coordination with specialist contractors, and a detailed approach to industrial automation requirements. Corplex is proud to have brought this cutting-edge galvanizing facility to life and to support Kingfield Galvanizing as they continue to lead the industry in sustainable steel treatment and advanced coating technologies.